Microworlds for Learning Through Inquiry
We discuss several computer-based environments to support learning through inquiry, called microworlds, including two focused on steam power plant operation and electronic troubleshooting....

An Interactive Computer Code for Generations of Artificial Earthquake Records
A new interactive computer code is presented in this work for the calculation of artificial earthquake records that comply with any arbitrarily specified target response spectra or power...

Rate of Settlement of Silt Alluvium at Trojan
Settlements of 1.83 m have been observed at the switchyard of the Trojan Nuclear Power Plant over a 22-year period since 1970. Rockfill had been placed on the site, a flood plain of the...

Measuring Air Concentration in Flowing Air-Water Mixtures
This paper describes the use of an electrical conductivity probe to determine aeration of a plunge pool by an overfall nappe. The probe was calibrated using an apparatus designed to provide...

Strain Measurement on the Runner of a Hydroelectric Turbine
Twelve strain gages were installed on the 10-m-diameter runner of Unit G-23 (700 MW) at Grand Coulee Dam, Third Powerhouse. The gages were located on both the pressure and suction sides...

Testing Turbine Aeration for Dissolved Oxygen Enhancement
During August of 1993 the Bureau of Reclamation tested turbine aeration for dissolved oxygen (DO) enhancement at Deer Creek Powerplant near Provo, Utah. This test required a variety of...

Pressure-Time Flow Rate in Low Head Hydro Plants
Very few methods are accepted for measuring the flow in the large intakes typical of low head, run-of-the-river hydro plants. These intakes are characteristically short, non-uniform, non-prismatic,...

On the Erodibility of Rock and Other Earth Materials
An outline of a new method to determine the erodibility of rock and other earth and engineered earth material is presented. The method quantifies the relative capacity of the boundary...

Scada System Requirements for Optimum Pumping
In order to minimize the cost of electric energy for pumping water through its distribution system, a computer program was developed to schedule the operation at eight pumping stations...

Integrated Planning for International River Basin
The integrated development of the Vardar/Axios Basin includes a system of projects scheduled to meet the needs and aspirations of Yugoslavia (in particular, the former Socialist Republic...

Fish Entrainment and Strategies for Diversion
Hydroelectric power projects often impound reservoirs which contain important recreational fisheries. The entrainment of fish through these facilities and the possible associated entrainment...

Hydro Plant Research Data Acquisition System
The Colton Hydroelectric Development, located on the Raquette River in the northwestern part of New York State, is the site of a two year research project to test the use of heated trashracks...

Floodflow Effects on Riparian Vegetation in Arizona
A relation for estimating changes in the condition of riparian vegetation as a function of stream power was developed for stream channels in central Arizona. Flood and vegetation data...

Air Concentration Measurements in Highly-Turbulent Flow on a Steeply-Sloping Chute
The U.S. Bureau of Reclamation's (Reclamation) stepped spillway overtopping protection research program required air concentration profile data be obtained during testing in a large, 15.2-m-high...

Numerical Modeling for Sediment-Pass-Through Operations of Reservoirs
Numerical modeling using the FLUVIAL-12 model was made to determine the feasibility and effectiveness for Sediment-Pass-Through (SPT) operation for Cresta and Rock Creek Reservoirs in...

Modeling Kinetics of Sediment Removal in Water Columns
Many physical, chemical, and environmental factors govern the rate of cohesive particle sedimentation in aquatic environments. A new information-based model that uses experimental information...

Investments in the Future
The projects that earned the 1994 Outstanding Civil Engineering Achievement Awards of Merit were improvements to the nations transportation and environmental infrastructures. On the outskirts...

Lessons Learned from the Design, Construction and Operation of Hydroelectric Facilities
Lessons Learned from the Design, Construction and Operation of Hydroelectric Facilities is an addition to the series of publications by members...

Detecting Dam Failures
Federal Energy Regulatory Commission guidelines say that unattended hydroelectric dams must be monitored against failure around the clock. Design and installation of failure monitoring...

Minimizing the Probable Maximum Flood
A newly-developed probable maximum precipitation (PMP) estimate for Wisconsin and Michigan reduced precipitation depths by 20%. Should a given area's probable maximum flood...

 

 

 

 